
Find drawing issues early. Keep them out of the field.
Review full drawing sets for code, coordination, and specification conflicts, with sources attached to each finding.
Corridor clear width below 44 in. minimum
Corridor too narrow for its occupant load
Corridor is 36 in. clear and serves 60 occupants. CBC Table 1020.3 requires 44 in. at 50 or more.
Widen to 44 in. clear and check door swings against CBC 1005.7.1.
Corridor too narrow for its occupant load
Corridor is 36 in. clear and serves 60 occupants. CBC Table 1020.3 requires 44 in. at 50 or more.
Widen to 44 in. clear and check door swings against CBC 1005.7.1.
4 issues found on A-201
Select a ticket to see its location and recommendation.
Built for the people reviewing the set
Swipe to explore →
Works inside the tools your team already uses
Issues land where the work already happens.
Swipe to see all tools →
Start with drawing QA/QC
Review the set first. Explore the tools for code questions, firm details, and construction administration as your team needs them.
Drawing QA/QC
Review multidisciplinary drawing sets for coordination, code, and constructibility issues before the set goes out.
Explore Drawing QA/QCCorridors serving more than 10 occupants in a sprinklered R-2 need a 0.5-hour rating under the 2022 Denver Building Code (IBC Table 1020.2). Wall type W4 on A-201 is 1-hour, so it complies.
Project Copilot
Find cited answers across codes, project documents, and firm standards.
Explore Project CopilotCast-in-place concrete mix designs
Slab edge detail at Grid C/4
Firestopping at Level 3 penetrations
Provide slab edge per detail 5/A-501; thickened edge continues to Grid 4 per S-201. No change to pour sequence.
Construction Administration
Track RFIs and submittals in one inbox and prepare cited draft responses.
Explore Construction AdministrationTypical RD/OFD
ApprovedRD/OFD section
ApprovedRD/OFD (PVC)
In reviewRD/OFD plan
DraftDetail Library
Search approved firm details and bring them into Revit for reuse.
Explore Detail LibraryAccelerate reviews
ArchiBoost gives us an extra layer of QA/QC on critical project information. Every question or conflict it flags is a potential RFI — and that means time and money.”

Linda Jackson, AIA, IIDA, LEED AP
Principal
OTJ Architects
Your drawings stay yours
We do not use private uploads to train AI models. See how service providers process files, who can access them, and how deletion works.

































