Your Archiboost QA/QC Check Found 1,176 Issues - Here's How to Decide Which Problems to Fix First
Remember one thing: decide what you will skip before you start reading.
Although delegating the tedious manual work of reviewing drawing sets, specifications, standards, project documents, emails and meeting notes to an artificial intelligence engine is the way to go, the list of issues generated may seem overwhelming, because the system catches a lot of items that human eyes would not.
The result can be a list longer than any team has time to read before a deadline, which makes the real task deciding where to start rather and how to rollout fixes, than finding the problems themselves. This guide shows how to sort findings into tiers, who should read each tier, and what to leave until later, using examples from real-world customer projects.
What have we seen happen before?
On one project, Archiboost identified 1,176 issues in a single issuance package - across drawings and specifications. The most effective solution - the project architect chose to start with the 30 marked as 'critical', delegating the 'low' issues to junior staff, and then reviewing the other findings with her larger team.
A project manager at a large construction firm had the same challenge on a different project, where his list ran past 5,620 findings and felt overwhelming at first; however, Archiboost's priority filters helped him sort, assign and delegate the tickets across his design-build team.
Both teams hit the same wall: the list is not the hard part, because the real difficulty is deciding where to start. Archiboost has designed features and workflows that help streamline exactly that, so that issues are fixed on paper before they reach the site.
[Image to add: screenshot of the priority filter showing only the critical findings, taken from the project.]
How do you sort findings into tiers?
Archiboost uses four tiers on its QA/QC findings, and this is how teams read them.
| Tier | What is included | What you do |
|---|---|---|
| Critical | Substantive problems - items most likely to result in RFIs, change orders, delays, or rework. | Review description, reasoning and recommendation, research constraints or potentials, flag, escalate or coordinate, and implement a fix when the design has been resolved |
| High | Big-impact tickets - items that can result in plan check comments and RFIs, and possibly have a budget and cost impact on the project. | Review the ticket, the description and the category of the issue - flag it to the right reviewer and add notes on why and when this issue needs to be resolved for a clearer pathway to maintaining quality. |
| Medium | Items that may be flagged a result of developing design, uncoordinated work and unresolved code solutions. | Keep an eye on these items and flag them to the appropriate reviewer - sometimes they may have just not had the time to fix the issue by the time the package was exported. |
| Low | Clerical errors - typos, misalignments, unreadable fonts etc. | Assign to one or two junior staff members to pick up in one sweep to avoid regenerating issues. |
Note: An issue that may seem 'Low' may actually be 'Critical'. For example - a typo in the occupancy of a building will escalate the issue to a critical issue. Archiboost uses project context to explain what the occupancy should be, but professional review is required to confirm its findings.
What does a first review actually catch?
In the first example mentioned above, the design team ran a QA/QC check on a drawing package a few days before a permit submission, and the architect told us she would have missed several of the findings:
-
Sheet numbers on the sheet index that did not align with the package
-
Background inconsistencies between disciplines
-
Balcony projections on one side that did not meet code
-
Code analysis entries left over from design changes made mid-project
Each finding came with a reference, so she could look up the relevant code sections, consultant drawings and specifications using 'Linked Assets' directly instead of searching for them.
What approach works?
A few habits make QA/QC results easier to parse through, and here is what some of our customers have told us:
-
Sending each finding to the right person. Findings can go to team members or outside consultants through an email link that shows only their items; in the first example, the architect assigned some findings to a colleague, and she added the firm's spec writer as an outside user to review the spec findings.
-
Fixing while reading. The architect also kept the review open beside Revit and fixed issues as she found them, while also manually adjusting the priority of tickets that did not need urgent action.
-
Canceling approved exceptions. The architect marked a ticket that was a city-approved exception as canceled, with a note - keeping it out of the open list.
-
Using one general note. At one design firm, a reviewer replaced a pile of repeated abbreviation comments with one general note on the cover sheet; he preferred to flag one or two instances, add the note manually, and let the team sweep the rest.
-
Exporting a lean version. Another reviewer exported two PDF markups, the first with every comment included and a second with critical and high items only, and he used the lean file for conversations with consultants, contractors and owners.
[Image to add: Bluebeam sheet showing the single general note on the cover sheet. Get permission from the design firm first.]
What do you do with special project documents - like code exceptions the city already approved?
Easy - mark the finding canceled, note the exception in the Comments section of the ticket and upload the city approval letter as a project document, so that future runs treat the exception as context and do not flag it again.
What should you try on your next project?
Remember one thing: decide what you will skip before you start reading.
-
Before the review, agree who reads which tier, and by when.
-
Read the critical findings first, on day one.
-
Send high findings to the discipline leads with a due date.
-
Batch low findings into one cleanup sweep.
-
Upload any other relevant project context to Archiboost, so the QA/QC system accounts for specific project conditions.
Frequently asked questions
How many findings are normal on a drawing set?
It varies with project size; a demo run on a single-family home returned 499 findings, a large healthcare project returned 1,176, and a large project returned more than 5,620.
Should you fix the low-priority findings?
Yes, but in one sweep rather than one at a time - for efficiency, you can also use Archiboost's Revit plug-in to fix typos quickly and easily.
Does automated review replace a senior reviewer?
No. The automated system is built to do one thing - reduce the manual page-turn effort in finding errors, gaps, inconsistencies and non-compliance. Licensed professionals need to review the findings surfaced by the system, validate them and then resolve them using their professional judgment.